Projects

BMS and EPMS projects, delivered by one accountable team

ABEC designs, installs and commissions the control systems that keep data centres and other critical infrastructures running, so you're never chasing multiple different suppliers.

22 years
of BMS and EPMS project experience
System agnostic
so you’re not locked into one vendor
13+ countries
active in with regional delivery

Trusted by

The common problem

Different regions.
Different suppliers.
One project that has to land on time.

Many data centre developers end up running BMS and EPMS projects through different OEMs and system integrators in every region, which is where consistency breaks down.

When a contractor underperforms or can't scale the project, the result has financial and reputational ramifications.

ABEC removes that risk by staying the single, accountable partner from design through commissioning, wherever the project site is.

1,000 people can be needed on-site for a single data centre build

They’re often spread across multiple trades and contractors. 
Every extra supplier in that mix is another place for accountability to slip.

140 projects currently queuing for a grid connection in the UK alone

When the pipeline itself is this stretched, a delay anywhere in
 delivery compounds fast.

200% growth of the UK BMS market between 2025 and 2032

Demand for reliable delivery capacity is growing faster than the 
pool of integrators who can actually be trusted with it.

How a project runs

Two ways in. One process that doesn't change.

New Builds (Major Projects)

Engaged during planning to design, install and commission new BMS and EPMS systems, from first fix through to final handover.

Upgrades & Modifications (Special Projects)

Working within a live building to modify or upgrade existing systems, without disrupting the operation running inside it.

How the
process works

Design

Full design and consultancy, including value engineering and integration to third-party systems.

Install

Control panel manufacturing, electrical installation and testing, and communications network installation, built to Part L, BREEAM and UPTIME Institute standards.

Commission

Systems tested, integrated and proven against specification before a single system goes live.

Handover & Support

Web-based front-end graphics, documentation and a soft landing into operation, so your team isn't left working out the system on day one.

Why clients choose ABEC to deliver

No vendor lock-in

ABEC is accredited and trusted across every major
platform: Trend, Siemens, Schneider, Distech, Cylon
and Tridium.

The system we recommend is the one that’s right for
the building, not the one we’re incentivised to sell.

One team, one point of accountability

Design, install and commissioning sit with the same
team throughout, so there’s no gap between
suppliers for a problem to fall into.

Engineers trained for the job, not just hired for it

ABEC’s own Academy takes mechanical and
electrical engineers from backgrounds like facilities
management and trains them into BMS control
systems specialists, which is how ABEC keeps scaling
through an industry-wide skills shortage.

Proof, not promises

Frequently asked questions

Do you work alongside our existing consultants or contractors?

Yes. ABEC typically works alongside mechanical and electrical consultants, main contractors and facility management teams already involved in a project, rather than replacing them.

We already work with another integrator. Why switch?

Most projects run into trouble when a regional integrator can't scale or underperforms partway through. ABEC can take over a live specification, or run a project from the start, as the single accountable team.

What size of project do you take on?

ABEC delivers projects from £5,000 through to £10,000,000, across hyperscale, enterprise, edge, colocation and HPC data centre environments.

We are also experienced in delivering projects across other critical infrastructure buildings.

Which platforms do you support?

ABEC is fully accredited across Trend, Siemens, Schneider, Distech, Cylon and Tridium, so the platform choice is based on what the building needs, not on what ABEC is tied to.